See your line’s truth, live on the floor

FloorSight is a production-monitoring appliance that counts every part, times every stop, and puts OEE on a scoreboard the whole cell can read. No PLC code changes. No software to install. Wire in a sensor, and the numbers you argue about in the morning meeting are settled before the shift ends.

120+metrics derived from two sensor inputs
1 weekfree trial — then a simple monthly membership
<1 hrtypical install, sensor to scoreboard

Running before lunch, reporting by end of shift

FloorSight is an appliance, not an IT project. There is nothing to install on a server and nothing to reprogram on the machine.

STEP 01

Connect sensors, power, network

Land one or two sensor inputs on the unit’s terminals, plug in power, and connect Ethernet.

  • Input 1 — In Count: every cycle or part produced
  • Input 2 — Good Count: parts that pass, for true quality rate
  • No software to install, no PLC code changes, nothing written back to the machine — FloorSight only listens
STEP 02

The line goes live on the floor

The scoreboard shows count, target, pace, state, and OEE the moment the machine cycles — and the same numbers open in any browser on your plant network.

  • Run / down state detected automatically from the count signal
  • Every stop timed to the second, no stopwatch, no paper log
  • Supervisors see the same truth from the office as operators see on the floor
STEP 03

Tag the reason, see the loss

When the line stops, the operator taps the reason — changeover, material wait, tool change. Reports roll those taps up into the losses costing you the most.

  • Downtime Pareto and Top Losses reports, by shift, part, and job
  • Uncoded stops are flagged, so missing reasons are visible instead of hidden
  • Export to CSV or pull data through the API for your own analysis

Three scoreboards. One monitor.

Every model runs the identical FloorSight monitoring software — same metrics, same reports, same downtime tracking. The only difference is the display on the floor and how operators interact with it. Pick the screen that fits your cell.

Model The scoreboard Operator interaction Price (USD)
FloorSight Touch Monitor + touchscreen in one unit Integrated industrial touchscreen mounted at the machine. The scoreboard, the reason keypad, and the job setup all live on one washdown-friendly panel the operator can reach. Operators tap downtime reasons, pick the job, and confirm changeovers right on the screen — nothing else to walk to. $39.95/moafter 1-week free trial Start 1-week free trial
FloorSight HD Monitor unit + HDMI output The monitor drives any TV or monitor over HDMI — use the big screen you already own, sized for the whole department to read from 50 feet away. Operators tag downtime reasons from any phone, tablet, or PC browser on the line — no app, nothing installed. $35.99/moafter 1-week free trial Start 1-week free trial
FloorSight LED Monitor unit + LED scoreboard Large alphanumeric LED scoreboard with high-visibility digits readable across a loud, bright plant — count, target, and state at a glance, no screen glare. Operators tag downtime reasons from any phone, tablet, or PC browser on the line — no app, nothing installed. $39.95/moafter 1-week free trial Start 1-week free trial
US pricing, per unit — 1-week free trial first, then billed monthly Volume discounts available for multi-machine rollouts Membership includes monitoring software, reporting, export, API access, and updates Sensor kits and mounting hardware quoted with your trial

Built to answer one question: where did the shift go?

Not a dashboard of vanity charts — a measurement system that ties every lost minute and every lost part to a reason you can act on.

Real-time scoreboard

Count, target, pace, run/down state, and OEE on the floor where the work happens — updated every cycle, readable from across the cell. When the line falls behind, everyone sees it while there is still time to recover the shift, not at tomorrow’s meeting.

UPDATES EVERY MACHINE CYCLE

Automatic downtime detection & reason tracking

The moment the count signal stops, the clock starts — no operator action needed to record the stop. The operator tags the reason when the line restarts. Stops nobody codes stay on the report as uncoded, so the size of your blind spot is itself measured.

EVERY STOP TIMED TO THE SECOND

OEE by shift, part, and job

Slice OEE and its three components any way the argument goes: by shift, crew, part number, job, or machine. See whether Tuesday’s second shift or one problem part is dragging the month — with the same sensor data underneath every view.

SHIFT · PART · JOB · MACHINE VIEWS

Pareto of downtime reasons + Top Losses

A ranked Pareto shows which reasons eat the shift, and the Top Losses report converts them into lost parts and lost hours at your ideal rate — so the improvement project picks itself, and its payoff is stated in units, not adjectives.

LOSSES IN MINUTES, PARTS & HOURS

120+ metrics from two sensor inputs

Two signals — In Count and Good Count — are enough to derive rate, pace vs. target, cycle-time distribution, scrap and yield, run/down/idle time, MTBF, changeover time, and the full OEE stack. Simple wiring, deep measurement.

IN COUNT + GOOD COUNT → 120+ METRICS

Browser-based reporting

Every report opens in a standard web browser on your plant network. No installed software, no per-seat licenses, no updates to push. The supervisor’s tablet, the office PC, and the screen in the break room all show the same numbers.

ANY BROWSER · NO SEATS · NO INSTALLS

Data export & API — your numbers stay yours

Export any report to CSV for Excel, or pull live and historical data through the built-in API into your ERP, MES, or BI tools. FloorSight’s job is to measure your floor; the data it collects belongs to you, in formats you can actually use, with no export fee and no lock-in.

CSV EXPORT · REST API · INCLUDED WITH MEMBERSHIP

A worked example, not a brochure number

Here is one full shift exactly as FloorSight recorded and reported it — every figure below ties to the same sensor data, and the arithmetic is shown so you can check it.

One shift at Northfield Metalworks

LINE 3 — CNC CELL · SHIFT B · JOB 4471 · BRACKET, STEEL

Planned production time for the shift: 525 minutes. The line stopped six times for a total of 42 minutes. At its ideal rate the cell should have made 1,418 parts in the time it ran; it made 1,248, of which 1,211 were good.

Availability — run time ÷ planned time483 ÷ 525 = 92%
Performance — actual count ÷ ideal count1,248 ÷ 1,418 = 88%
Quality — good parts ÷ total parts1,211 ÷ 1,248 = 97%
0.92 × 0.88 × 0.97 = OEE 78.5% Availability × Performance × Quality

Downtime Pareto — this shift

Changeover18 MIN
Material wait11 MIN
Tool change8 MIN
All other stops5 MIN
TOTAL DOWNTIME: 42 MIN · 525 PLANNED − 42 = 483 MIN RUN TIME

Read it the way a supervisor would: the biggest single loss is the 18-minute changeover, not breakdowns. At this cell’s ideal rate (1,418 parts per 483 run minutes, about 2.9 parts a minute) the 42 stopped minutes cost roughly 123 parts, and running below ideal speed cost 170 more — together the 293-part gap between the 1,541 the cell could have made in 525 minutes and the 1,248 it did. That is a SMED project and a speed study, not a maintenance call, and the shift report makes the case on its own.

Try FloorSight free for 1 week

A full production week on your own line, with your own parts and your own operators — long enough to cover changeovers, a bad shift, and the morning meeting where the report does the talking. Your trial runs through a Gumroad membership: free for 1 week, then the model price billed monthly.

  • We configure the unit for your line before it ships
  • Install is sensors, power, Ethernet — typically under an hour
  • Full reporting from the first cycle, not a demo mode
  • No charge during the 1-week trial — then billed monthly, cancel anytime

Start your FloorSight membership

Membership is handled through Gumroad — secure checkout, the 1-week free trial, and monthly billing after that, all in one place.

  • FloorSight TouchMonitor + touchscreen in one unit $39.95/moafter trial
  • FloorSight HDMonitor unit + HDMI output $35.99/moafter trial
  • FloorSight LEDMonitor unit + LED scoreboard $39.95/moafter trial
Start 1-week free trial

Free for 1 week, then billed monthly at the model price above. Cancel anytime.

Learn: the ideas behind the numbers

Short, plain-language explainers on the measurements FloorSight automates — written for the people who run the floor, not for a textbook.

What is OEE?

OEE — Overall Equipment Effectiveness — answers a deceptively simple question: of the time this machine was scheduled to produce, how much of it made good parts at full speed? It is a single percentage built from three factors:

OEE = Availability × Performance × Quality

Availability is run time divided by planned production time. It falls every time the line stops — breakdowns, changeovers, waiting on material. Performance compares the count you actually made while running against the count the machine’s ideal cycle time says you should have made; it falls to slow cycles and brief, unrecorded micro-stops. Quality is good parts divided by total parts; it falls to scrap and rework.

Multiplying the three matters. A line can look busy all shift (high availability) while crawling (poor performance), or run fast while making scrap. OEE refuses to let any one factor hide behind the others — which is why a genuinely good shift is rarer than it feels, and why most first OEE measurements surprise the people who take them.

Downtime tracking

Ask a plant where its time goes and you will usually get a clipboard: operators writing down stops from memory at the end of the shift, in round numbers, with the embarrassing reasons left vague. The data isn’t dishonest — it’s just human. Studies of manual logging routinely find a large share of stop time never recorded at all, and short stops almost never.

Automatic detection fixes the timing problem: the stopwatch starts when the machine stops and ends when it restarts, whether anyone writes anything down or not. The operator’s only job is the part a sensor can’t do — naming the reason. A short list of reason codes (changeover, material wait, tool change, breakdown, no operator) tapped at restart turns raw stop time into a Pareto you can act on.

Two habits make downtime data trustworthy: keep the reason list short enough to tap in seconds, and treat uncoded stops as a metric in themselves. When uncoded time creeps up, the measurement system — not the operator — is what needs attention.

The Six Big Losses

The Six Big Losses are the classic breakdown of where productive time goes. Each one maps cleanly onto an OEE factor:

  • Availability losses: (1) equipment failure and breakdowns, (2) setup and changeover — the time between the last good part of one job and the first good part of the next.
  • Performance losses: (3) idling and minor stops — jams, misfeeds, and sensor trips too short to log by hand, (4) reduced speed — running below ideal cycle time because of wear, settings, or caution.
  • Quality losses: (5) process defects — scrap and rework made while running, (6) startup and yield losses — the bad parts made while a process warms up or settles after a changeover.

The framework’s value is discipline: when a shift’s OEE drops, you can walk the six losses in order and find which one moved, instead of debating impressions. Most plants discover the same surprise — the losses that feel biggest (breakdowns) are often smaller than the quiet ones (minor stops, slow running, long changeovers) that nobody was measuring.

OEE benchmarks & the 85% question

The most quoted number in manufacturing is 85% OEE — “world class.” It comes from multiplying three demanding targets: 90% availability × 95% performance × 99.9% quality = 85.4%. It was a stretch goal for the best-run discrete manufacturing lines, and it assumes those plants define their planned time and ideal rates the same way you do.

A commonly cited range for a typical plant is 40–60% OEE on first honest measurement — which shocks teams who expected 80%. The gap is usually not laziness; it is the unmeasured losses (minor stops, slow cycles, uncoded downtime) becoming visible for the first time.

Use benchmarks carefully. OEE is only comparable when the definitions match: what counts as planned time, whose ideal cycle time, whether changeovers are inside or outside the number. The most useful benchmark is your own line last month. A plant that moves from 52% to 61% OEE has added the equivalent of a free shift of capacity every week or so — whatever the world-class posters say.

Questions from the plant floor

Does it need PLC changes?

No. FloorSight never writes to your machine or its controller. It listens to sensor signals — a count pulse, a prox switch, a photo-eye — and does all of its timing and math inside the unit. Your PLC program stays untouched, your controls engineer keeps their weekend, and there is nothing to validate after install because nothing on the machine changed.

What sensors does it use?

Standard industrial sensors: proximity switches, photo-eyes, and dry-contact or pulse outputs from equipment you already have. Input 1 (In Count) pulses once per cycle or part; Input 2 (Good Count) pulses once per good part — often tapped from an existing reject or inspection signal. If your machine already outputs a count signal, FloorSight can usually share it. Sensor kits matched to common machine types are quoted with your trial.

What if a machine has no count signal?

Use the run/down signal option. A single input — from a motor contact, a current switch, or a stack light — tells FloorSight whether the machine is running or stopped. You get full state and downtime tracking with reason codes, plus availability-based reporting, without inventing a count that doesn’t exist. It’s the right setup for welders, ovens, mixers, and older equipment where “running vs. stopped” is the truth that matters.

How does billing work?

FloorSight runs on a Gumroad membership. You start with a 1-week free trial; after that, the model price is billed monthly — Touch $39.95/mo, HD $35.99/mo, LED $39.95/mo. The membership includes the monitoring software, browser reporting, CSV export, API access, and software updates, with no per-seat licenses and no charge to get your own data out.

What happens after the 1-week trial?

Your Gumroad membership converts to paid monthly billing at the model price for the unit you chose. If you cancel before the trial ends, you are not charged. You can export your data to CSV at any time, so your shift reports stay yours to keep either way.